There are 21 separate points that the report suggests we cover in our report.
I suggest we simply take seven parts each.
Jason- first seven
Cesca - second seven
Craig - Third seven
Please put in as many pics as you can, reference everything and put your name on each page. Then a few days before it's due we'll all meet up and edit it.
Thanks.
Sunday, September 21, 2008
THE BIG REPORT
May I be frank and say that I'm not that great with reports but Nick is and I'm pretty good with models, so, Nick, can you and I maybe swap jobs?
Sunday, September 7, 2008
Breakdown of report
How would you guys like to break down the report into sections? Or should we work on it all together?
Sunday, August 31, 2008
project 5 and 6
hey everyone here is what we are doing next...
Ash model
James model
Nick model
Stuart model
Jason report
Cheska report
Craig report
check dso for details
Ash model
James model
Nick model
Stuart model
Jason report
Cheska report
Craig report
check dso for details
Thursday, August 28, 2008
NICE WORK GUYS!!
Although we had all the issues with sections I think we've all done a really good job and pulled the whole thing together nicely.
Tuesday, August 26, 2008
new most recent stuff
these are the sections we are doing NOW!!!
NICK 3.0, 3.3, 3.4, EDIT
JASON 3.1, 3.2
CHESKA 3.7, 3.8
ASH 3.5, 3.6
STU, JAMES, CRAIG redesign the units
NICK 3.0, 3.3, 3.4, EDIT
JASON 3.1, 3.2
CHESKA 3.7, 3.8
ASH 3.5, 3.6
STU, JAMES, CRAIG redesign the units
Monday, August 25, 2008
Select a unit???? A102 ???
If we are to select just one unit as hilary as suggested in the announcements on dso, we should pick one from the second floor (A102) as the units on this flooor have a set of two stairs in them. We need to work this out quickly, perhaps everyone can look at ur allocated section and how it applies to one of these units and then tommorrow (wednesday) we can meet in the afternoon to collaborate into one report.
Craig
Craig
Look Here!
if anyone has logged onto dso you would have seen the announcment that Hilary posted saying that we should attempt to upgrade one flat to met a range of disabilities...i have already done some of this but maybe we should get toether and focus just on this task as most of the other sections in the BCA are quite irrelevant and we could get a much better report going if we all focused on the one task. I have already done the bathroom of one of the units, and the lifts, entrance and stairs on the larger scale. let me know what you guys think.
James
James
Sunday, August 24, 2008
CHANGE OF PLANS!
Unfortunately we've all been doing the wrong BCA sections.
We aren't supposed to be doing PART F, so stop what you're doing.
We've re-appointed sections-
Ja - D 3.1
Nick - D 3.0, Editing
Craig - D 3.2, D 3.8
James - D 3.3 & 3.4
Ash - D3.5
Cesca - D3.6
Stew - D3.7 & F 2.4
It was commented that we need more pics and diagrams. Since the sections are so small it should be easy. ALSO they said we need to pay more attention to the Australian Standards references.
ALL parts due by Wed night 7pm.
JAMES!!
Hey Dude,
We forgot to give you a section from the BCA so we're giving you Nick's section F1.08 to F1.13.
And to EVERYONE,
we all need to Email our completed sections to Nick by Wednesday Evening on nmwill@deakin.edu.au
Saturday, August 23, 2008
Sunday, August 17, 2008
Wednesday, August 13, 2008
James
yeah doesnt really does it, maybe summerize and shit, and mention why they dont apply.
next Cheska craig and i are still having problems with login! (like two straight days now) and probably wont get it done till late Wed nite, but we'll email it to you so its ready and fresh for thursday
cheers
stuart and craig, (one hot couple team)
next Cheska craig and i are still having problems with login! (like two straight days now) and probably wont get it done till late Wed nite, but we'll email it to you so its ready and fresh for thursday
cheers
stuart and craig, (one hot couple team)
Monday, August 11, 2008
Saturday, August 9, 2008
Sunday, August 3, 2008
tasks for assignment 2
Stuart and Craig.... D2.0-D2.23
Nick......D1.0-D1.17
James....D3.0-D3.8 and E2.0-E2.3
Jason.....E1.0-E1.10
Cheska....E3.0-E3.8, and editing
Ash..........E4.0-E4.9
Nick......D1.0-D1.17
James....D3.0-D3.8 and E2.0-E2.3
Jason.....E1.0-E1.10
Cheska....E3.0-E3.8, and editing
Ash..........E4.0-E4.9
Sunday, July 27, 2008
Thursday, July 24, 2008
Wednesday, July 23, 2008
SECTION DESIGNATION
Section 1
Jason- 1.11, 1.12, 2.10Cesca - 2.11, 2.12, 2.13, 2.14
Ash - compilation of summaries
Section 2
Craig -2.0, 2.1, 2.2
James -2.3, 2.4, 2.5, 2.6
Stuart -2.7, 2.8, 2.9, 2.10
Nick- 2.11, 2.12, 2.13, 2.14
And ALL of us need to do one picture for the presentation.
Nice work guys!!
Craig -2.0, 2.1, 2.2
James -2.3, 2.4, 2.5, 2.6
Stuart -2.7, 2.8, 2.9, 2.10
Nick- 2.11, 2.12, 2.13, 2.14
And ALL of us need to do one picture for the presentation.
Nice work guys!!
Monday, July 21, 2008
SUMMARY OF 2.7, 2.9
Building is TYPE A.CLASS 3
2.7 : Separation by fire walls
A) The CONSTRUCTION of a fire wall must be in accordance with the following factors:
1.“The fire wall must have the relevant FRL that has been prescribed by Specification C1. 1 for each of the adjoining parts”
Note that Specification C1.1 presecribes that…..
- The mimimum type of fire resisting construction of a buliding has exceptions for certain class 2, class 3 or class 9c buildings in c1.5 and also has exceptions for open spectator stands and indoor sports stadiums found in c1.7
Buildings with a rise of 4+ stories that are class 2,3 or 9 require class A construction
Buildings with a rise of 4+ stories that are class 5,6.7,8 require class A construction
Buildings with a rise of 3 stories that are class 2,3 or 9 require class A construction
Buildings with a rise of 3 stories that are class 5,6,7,8 require class B construction
Buildings with a rise of 2 stories that are class 2,3 or 9 require class B construction
Buildings with a rise of 2 stories that are class 5,6,7,8 require class C construction
Buildings with a rise of 1 stories that are class 2,3 or 9 require class C construction
Buildings with a rise of 1 stories that are class 5,6,7,8 require class C construction
- If the FRL for each of the adjoing parts are different then you must use the FRL that is the greatest (to accommodate the maximum possible).
- The only reason that a FRL would be allowed to be lower is if it is on the carpark side of a building
2.“Any openings in the fire wall must comply with the Deemed-to-Satisfy-Provisons of part c3”
-Deemed-To-Satisfy-Provisions of part c3 state that….. opening in building elements required to be fire resistiant include:
> doorways
> windows (including any associated fanlight)
> infil panels
> fixed or openable glazed areas
Where protection is deemed required…
Windows/ Doorways/ other openings> need to be protected with internal or external wall wetting sprinklers
B.) SEPARATION OF B UILDINGS
Buildings can be treated as “separate fire compartments” and therefore “separate buildings” if….
- a fire wall extends thru all parts and stories of a wall therefore fully dividing it
- the fire wall is covered thru the underside of the roof covering
- there are a few other specifications for this if the wall doesn’t meet up with the roof
******See this section for details in 2.7
2.9
-for type A construction (what the building is) “the floor between the two adjoining parts must have a FRL of no less than that described in c1.1 and no less than that prescribe for the lower of the two stories.
(see the table in 2.7 summary for story requirements, above)
2.7 : Separation by fire walls
A) The CONSTRUCTION of a fire wall must be in accordance with the following factors:
1.“The fire wall must have the relevant FRL that has been prescribed by Specification C1. 1 for each of the adjoining parts”
Note that Specification C1.1 presecribes that…..
- The mimimum type of fire resisting construction of a buliding has exceptions for certain class 2, class 3 or class 9c buildings in c1.5 and also has exceptions for open spectator stands and indoor sports stadiums found in c1.7
Buildings with a rise of 4+ stories that are class 2,3 or 9 require class A construction
Buildings with a rise of 4+ stories that are class 5,6.7,8 require class A construction
Buildings with a rise of 3 stories that are class 2,3 or 9 require class A construction
Buildings with a rise of 3 stories that are class 5,6,7,8 require class B construction
Buildings with a rise of 2 stories that are class 2,3 or 9 require class B construction
Buildings with a rise of 2 stories that are class 5,6,7,8 require class C construction
Buildings with a rise of 1 stories that are class 2,3 or 9 require class C construction
Buildings with a rise of 1 stories that are class 5,6,7,8 require class C construction
- If the FRL for each of the adjoing parts are different then you must use the FRL that is the greatest (to accommodate the maximum possible).
- The only reason that a FRL would be allowed to be lower is if it is on the carpark side of a building
2.“Any openings in the fire wall must comply with the Deemed-to-Satisfy-Provisons of part c3”
-Deemed-To-Satisfy-Provisions of part c3 state that….. opening in building elements required to be fire resistiant include:
> doorways
> windows (including any associated fanlight)
> infil panels
> fixed or openable glazed areas
Where protection is deemed required…
Windows/ Doorways/ other openings> need to be protected with internal or external wall wetting sprinklers
B.) SEPARATION OF B UILDINGS
Buildings can be treated as “separate fire compartments” and therefore “separate buildings” if….
- a fire wall extends thru all parts and stories of a wall therefore fully dividing it
- the fire wall is covered thru the underside of the roof covering
- there are a few other specifications for this if the wall doesn’t meet up with the roof
******See this section for details in 2.7
2.9
-for type A construction (what the building is) “the floor between the two adjoining parts must have a FRL of no less than that described in c1.1 and no less than that prescribe for the lower of the two stories.
(see the table in 2.7 summary for story requirements, above)
man this is confusing
hey everyone....just been havn a crack at my section and omg....it just keeps cross referencing and cross referencing and cross referencing everyone elses sections which makes it like legal jargon to read.....faaaark. hope its a bit easier for everyone else!
james, u said u couldnt get the dso link? just check what section u are doin in the list posted previously and then go to the subject homepage on dso and someone has actually scanned in and posted the whole of the bca....and then just scan thru til u find yours. hope that helps!
james, u said u couldnt get the dso link? just check what section u are doin in the list posted previously and then go to the subject homepage on dso and someone has actually scanned in and posted the whole of the bca....and then just scan thru til u find yours. hope that helps!
TEAM INFO
ok guys, here is a whole heap of housekeeping stuff we might need...
and if stu can add his mobile on another post we will be sorted!
team members INFO....
1. nick williams nmwill@deakin.edu.au / 0431584285
2. james sereda jvs@deakin.edu.au / 0433981542 / 0410273513
3. ashleah hussein ahuss@deakin.edu.au/ 0402597246
4. francesca meldrum frmm@deakin.edu.au/ 0403533228
5. stuart dillion shdi@deakin.edu.au/ ?????
6. craig willis cdwil@deakin.edu.au/ 0421464801
7. jason gec jagec@hotmail.com/ 0434526111
SECTIONS:
1.2,1.3 jason
1.4, 1.8 nick
c1.0,c2.2 craig
c2.3, c.2.2 james
2.6 ash
2.7, 2.9 cheska
2.10, 3.2 stu
now, im not entirely sure where this link is on dso either....nick definetly knows cos he printed it....but i was planning on doin my section later tonight cos ive got other plans today. but maybe call nick?
btw, just emailed hilary :) so thats done
good luck guys...i reakon just the fact that most people hav blogged already is a VERY good sign!
cheska
and if stu can add his mobile on another post we will be sorted!
team members INFO....
1. nick williams nmwill@deakin.edu.au / 0431584285
2. james sereda jvs@deakin.edu.au / 0433981542 / 0410273513
3. ashleah hussein ahuss@deakin.edu.au/ 0402597246
4. francesca meldrum frmm@deakin.edu.au/ 0403533228
5. stuart dillion shdi@deakin.edu.au/ ?????
6. craig willis cdwil@deakin.edu.au/ 0421464801
7. jason gec jagec@hotmail.com/ 0434526111
SECTIONS:
1.2,1.3 jason
1.4, 1.8 nick
c1.0,c2.2 craig
c2.3, c.2.2 james
2.6 ash
2.7, 2.9 cheska
2.10, 3.2 stu
now, im not entirely sure where this link is on dso either....nick definetly knows cos he printed it....but i was planning on doin my section later tonight cos ive got other plans today. but maybe call nick?
btw, just emailed hilary :) so thats done
good luck guys...i reakon just the fact that most people hav blogged already is a VERY good sign!
cheska
stu
Francesca has the details to post of everyone jason. Just to help people (cos it took me an hour just to figure out) here are some details about the building ;
- Class 3 building (other residential)
- Type A construction
- FRL (fire resistance level)
On another note we may have to delegate more sections (maybe) to everyone because i think there are a lot more cluases we didnt cover because they were not on that sheet we printed and went off.
We can discuss on wednesday.
- Class 3 building (other residential)
- Type A construction
- FRL (fire resistance level)
On another note we may have to delegate more sections (maybe) to everyone because i think there are a lot more cluases we didnt cover because they were not on that sheet we printed and went off.
We can discuss on wednesday.